Steel structure is a new light steel structure building system.These structures are connected mainly by welding, bolts or rivets.At present, the most common steel structure buildings are: single-storey, multi-storey workshop; Multi-storey and high-rise civil buildings; Supertall buildings; Large span roof, floor and other public buildings.The main building forms are mesh frame, mesh shell, suspension cable, arch, three-dimensional truss and so on.Steel structure buildings are widely used in various fields of industry, such as hangars, storage warehouses, factories, workshops, commercial buildings, shopping malls, exhibition halls, supermarkets, office buildings, etc.
Insulation property
The thermal insulation material used in the building is mainly polyurethane sandwich board, which has good thermal insulation effect. The thermal insulation board used for the external wall can effectively avoid the “cold bridge” phenomenon of the wall and achieve better thermal insulation effect. The thermal resistance of the polyurethane sandwich plate with thickness of about 50mm can be equivalent to that of a brick wall with thickness of 1m.
Technical Specifications:
Product Origin: Hebei, China
Shipping Port: Tianjin
Lead Time: About 30 Days
custom: Accept customization
Scope of use: All kinds of steel structure buildings
Advantage: Strong compression resistance
Size:Customized
Application:Steel Structure Warehouse/Workshop/Hanger/Shed/ Sports Stadium
Main Frame:H section steel
Physical shooting
Drawing presentation
FAQ:
Q1: What are your company’s strengths?
A: Our product assurance quality, in the same price, the best quality.
Q2: Do you offer service for installation?
A: We will give detailed installation drawings and videos for free. And if you need, we could send engineers as installation directors.
Q3: Do you offer designing service for us?
A: Yes, we have an experienced design team, and we can design full solution drawings as per your requirements.
Q4: What is the delivery time?
A: Generally, the delivery time will be 30 days after receiving the deposit.
Q5: How can you get a quotation for your projects?
A: Our staff is online in real time.