Construction control of steel portal frame warehouse

The construction of steel portal frame warehouse involves many links, and each link needs to be strictly controlled to ensure the quality of the project. Only by fully preparing before construction, fine management during construction, strict acceptance after construction and later maintenance can we ensure the safe……

Construction control of steel portal frame warehouse

The construction of steel portal frame warehouse involves many links, and each link needs to be strictly controlled to ensure the quality of the project. Only by fully preparing before construction, fine management during construction, strict acceptance after construction and later maintenance can we ensure the safety and durability of steel portal frame warehouse. This article mainly discusses how to do a good job of control during and after construction.

Fire prevention and anti-corrosion treatment according to local conditions
The steel portal frame warehouse buildings are susceptible to fire and corrosion during use, so fire prevention and anti-corrosion treatment must be carried out. When choosing a fireproof coating, it should be ensured that it has good fire resistance and is applied according to the design requirements. For anti-corrosion treatment, appropriate anti-corrosion materials should be selected according to environmental conditions, such as the difference between the north and the south, the difference between inland and coastal cities, wind sand and other factors, and regular maintenance should be carried out to extend the service life of the structure.

Quality acceptance and post-maintenance
After the completion of the construction of the steel portal frame warehouse, a comprehensive quality acceptance should be carried out to ensure that the indicators meet the design requirements. In the process of acceptance, attention should be paid to the stability of the structure, deformation, weld quality, etc. In addition, in the later use process, regular inspection and maintenance should also be carried out to discover and deal with potential problems in a timely manner to ensure the safe use of the structure.

Technical Specifications:

material:     Steel and alloy structural steel

Payment:       T/T & L/C

Product Origin:  Hebei, China

Shipping Port:   Tianjin

Lead Time:      About 30 Days

custom:       Accept customization

Scope of use:   All kinds of steel structure buildings

Advantage:    Strong compression resistance

Size:Customized

Application:Steel Structure Warehouse/Workshop/Hanger/Shed/ Sports Stadium

Main Frame:H section steel

Purlin:C,Z purlin

Roof and Wall Material:EPS/rock wool/fiberglass wool/PU sandwich panel,corrugated sheet

Surface Treatment:Hot-dip galvanized,electric galvanization,paint

Performance:Heat-insulation,Fire proof,Sound proof,recyclable

Process

RELATED PROJECTS

INQUIRY NOW

Need to Talk to an Expert?

Contact Us For :

  • Tellphone:

  • +8618831701758

    0086 15731720070

  • Address:

  • botou city, Cangzhou City, Hebei Province , China

Construction control of steel portal frame warehouse

Construction Guide

Contact Us

Subscribe

Sign up for the latest product and event news

Copyright @ 2024 Metal Steel Structure Manufacturer     
x

Inquiry Now

Name:
Phone:
Email:
Message: