50X100 metal building
Define your needs beforehand
Our 50X100 steel structures can be used for a wide range of purposes, from warehouses to car repair shops. You can use it according to your specific needs.
Before you want to build a 50X100 steel structure, you need to know the following questions. What is the purpose of the building? Where is the building to be built and what is the geographical location? Which side is the building facing? What is the interior layout of the building? Clarifying the answers to these questions will give our designers clarity on how to design specific architectural drawings for you.
The advantages of 50X100 steel construction.
Faster construction: Compared to traditional buildings, our prefabricated steel structures can save 30% to 50% of the construction time. Fewer hours and lower labor costs can save you input costs.
Reduce insurance costs: Steel structure buildings have the characteristics of non-flammable, which means that insurance costs are saved to a large extent. Compared with traditional construction structures, properly designed and constructed steel structures have good wind, rain, snow, earthquake and fire resistance.
Lower maintenance costs: Insect infestation, decay and structural deterioration are virtually eliminated compared to conventional buildings.
A wide range of uses: 50×100 steel structures are suitable for a variety of ways, such as shops, warehouses, auto repair shops, grain storage warehouses and so on.
Price of 50X100 steel structure building
There are several types of factors that affect the price of 50×100 steel structure construction.
Material cost:
The main materials of steel structure construction include steel, connectors, coatings and so on. Among them, the use of steel is the largest, and its price is mainly subject to market fluctuations. For building materials, we need to understand the geographical location of your building project in advance, mainly in order to take into account the local wind speed and other factors to choose the appropriate construction steel. Not only that, the quality, specifications, thickness and other factors of various materials will also have an impact on the price.
Processing cost:
Steel structure buildings need to be pre-processed in the factory in advance, including cutting, welding, correction, rust removal, painting and other processes.
Our processing costs mainly depend on the complexity of the products you order and the amount of materials you use.
Transportation cost:
After the production of steel structure building components is completed in the factory, they can be transported to the construction site. In this process, it is necessary to pay attention to the transportation cost. Shipping costs depend on the size and weight of the component and the distance to be transported. If you order our products, we will choose the lowest shipping cost for you.
Installation cost:
After the steel structure members arrive at the construction site, they can be installed. Installation requires a certain labor cost. The labor cost is mainly affected by the scale of the project, the difficulty of construction, the time limit and other factors.
Other expenses:
In addition to the above basic costs, there are also some other costs. Such as design costs, taxes, etc., these costs also need to be included in the total cost of the steel structure project. In addition, our building does not include basic materials such as wires, and you need to purchase them by yourself.